
2002
October 4, 2024
2008
October 4, 2024RELOCATION
Relocated to Jebel Ali Industrial Area 2, expanding to 80,000 sqm.
FACILITY UPGRADES
Installed the largest Corrugator in the Middle East (2.8 meters) and 3 converting machines, a German 5-color printer and Rotary Die-Cutter, a large format FFG and a Flat Die-Cutter.